Piney Creek Wastewater Treatment Plant

  • Piney Creek Wastewater Treatment Plant; Beckley, WV

Chapman Technical Group provided design and construction phase services including full-time construction observation for a new 4.5 MGD wastewater treatment plant and improvements to the existing 3.5 MGD Piney Creek wastewater treatment plant for the City of Beckley Sanitary Board. The new plant includes two sequencing batch reactor treatment tanks, equalization basin, SBR control/blower building, influent distribution box, rate-of-control valve, ultraviolet disinfection system, emergency generator, and site work. The design average daily peak and peak daily flows for the combined treatment plants are now 8.0 MGD and 18.0 MGD respectively.